Site Information

CONNECT WITH US

 Loading... Please wait...
  • Image 1

17 ft. Wide Gothic - Standard Packages

(330) 283-57`17
Quantity:

Product Description

TVH 17 ft. Gothic High Tunnels

All Tunnel Vision Hoops Standard High Tunnel packages are developed with strength and longevity in mind; high quality steel, robust snow supports , and thourough wind bracing make Tunnel Vision Hoops structures among the strongest in the industry. 

Each of our standard DIY High Tunnels comes with all materials necessary to complete the installation of your stucture. This means that you will not need to purchase lumber to frame your end walls, or lumber for your base boards. Steel End-Wall Framing and Steel Base Boards come standard with every package. Below is a full list of components coming standard with this DIY Kit Package. If interested in upgrades please send us an email through our "Contact Us" Page above. 

Spec List for the TVH 17 ft. Gothic Standard Package

  • Galvanized Steel Base Frame - 1.90” OD Galvanized Steel Tube
  • Patented Dual Point Base-Wedge Anchors – Includes fittings, and angle irons
  • Hoops with 4 ft. side walls - constructed from 1.66” OD Galvanized Steel Tube
  • Hoops Spaced 4 ft. on Centers
  • (3) Full Length Purlins – 1.315” OD Galvanized Steel Tubing                                              
  • Truss’s on All Interior Hoops – 1.66” OD Galvanized Steel Tubing
  • Truss Supports on All Interior Hoops – [V – Style] 1.315” OD Galvanized Steel Tubing 
  • (4) Steel Tubing Cross / Wind-Braces – 1.315” OD Galvanized Steel Tube
  • (4) Dual Side Peak End-Wall Bow Braces – 1.315” OD Galvanized Steel Tube
  • 2” x 2” Galvanized Steel Square Tube End-Wall Packages (Includes all Framing, Ell Brackets, Hardware, etc.) 
  • (2) End-Wall Ridge Vents – one 24” x 24” Aluminum Shutter with Solar Operator per end
  • (1) Front End-Wall Half Steel Half Glass Personnel Door – 36” x 80”      
  • All Necessary Poly Securement U-Channel and Wire
  • (1) 4 Year 6 mil IRAD Greenhouse Plastic Cover for Top
  • (2) 4 Year 6 mil End-wall Plastic
  • (2) Full Length Roll-up Sides With with Manually operated Gearbox and Handles for Operation     
  • Full Length roll-up side anti-billow securement
  • Full Length Double Channel Aluminum Extrusion Hip Rail
  • Full Installation Instructions and Comprehensive Customer Support

Shipping

  • High Tunnel packages have a standard lead time of 15 business days from time of payment until date of shipping
  • High Tunnels ship via UPS Freight, ABF Freight, or a Tunnel Vision Hoops LLC contracted hauler

Professional Installation

  • Interested in having your High Tunnel installed by Professionals? Send us a message at info@tunnelvisionhoops.com

Product Reviews

Write Review

This product hasn't received any reviews yet. Be the first to review this product!

Find Similar Products by Tag

Find Similar Products by Category